If you used v crimp style tin you are finished.
How to tin an oval roof.
Take a pencil and trace the light on the underside of the roof deck.
How to repair single wide mobile home trailer roof training roof replacement on a single wide trailer.
Measure the smallest distance across the oval a line parallel to the ridge of the roof.
Notch the trim to lay it over the peak and secure it with 1 4 inch metal to wood screws.
Hold the nozzle of the sprayer 1 2 ft 30 61 cm away from your roof and pull the trigger.
Each metal roof is designed and produced on high tech computer controlled machinery by one of the largest sheet metal fabricators in the country.
You will most likely have to order the roofing metal in the amount and color specific to your house.
Slide a washer onto a 1 1 2 inch wood screw and drive it through a low.
That gives you a perfect oval about the size of the inside of the pipe or chimney.
Attach 3 by 3 foot sheets of tin to each section of the frame using 1 inch steel hex washer head screws and a cordless drill.
The roof can be installed either over top of.
See also how to draw an oval for 2 methods to mark out an oval including very large ovals.
Let go of the trigger at the end of your stroke.
Screw the steel hex washer head screws into the tops of corrugated waves of tin roofing material to prevent leaking through screw holes at the bottoms of the waves when rain runs down the roof.
Songle wide mobile home roof training how to we are.
You will also need a large garbage can a jigsaw or power metal shear a staple gun a drill and assorted drill bits 1 inch roofing nails metal roofing screws and self drilling self sealing wood screws.
Drip edge metal valley flashing dormer chimney and kickout flashing are types of roof flashing that shed water away from the connections between roofs walls chimneys and other building assemblies.
Lay the first piece of tin roofing in a bottom corner of the roof.
Install metal trim along the roof edge and across the peak.
Compare this measurement to the outside diameter of the pipe or chimney you want to put through the roof.
Position it so it overhangs the edge at least 4 inches.
Move your sprayer from the peak of your roof to a spot 3 4 ft 0 91 1 22 m down.