However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Installing shower door trim.
How to trim a door.
Tips and tricks to make your install easier.
Learn how to replace the water barrier on the bottom of a glass shower door.
Install wall anchors according to instructions where there is no stud available.
Installing a glass door system can be really straight forward.
Haven helping you to show your house some love.
Repeat the drilling in the opposite wall for the other wall jamb.
Cut the base track to length.
Seals typically slide into a channel at the bottom of the door or they are placed between the base of the door.
Measure the width at the bottom of the shower opening.
Put it in place and tape it down until the side rails are in place image 2.
Remove the wall jamb and drill the holes for the mounting screws or wall anchors.
If you re drilling into ceramic tile use a carbide tipped masonry drill bit.
Run a bead of silicone on the underside of the threshold piece image 1.
The first time you do it it will take longer but once you get the hang of it you ll be trimming out doors like a pro.
Before you go attaching the tracks on forever you need to place them.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
If you are already a pro you can still pick up some tips.
Cut the tracks to the appropriate size if necessary.
Fill in all the measurements and take it with you to the showroom.
Towel off the wet frame before adding more sealant and allow the sealant to cure completely prior to your next test.
Click enlarge this image to.
Measure and mark where the track will go.
Travis larson senior editor at the family handyman will show you how to trim a door in about 10 minutes per side.
All you need is a pair of scisso.
If water is escaping between the door and base track consider attaching a separate drip tray to catch and redirect what.
How to install a shower door shower door overview.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
Drill the holes you marked.
Installing a swinging shower door 1.
Drill proper holes into the walls for the side rails.
Inspect the bottom of the shower door to determine the plastic seal attachment method.