Page 1 installation and care guide guide d installation et d entretien guía de instalación y cuidado bypass shower doors portes coulissantes de douche puertas corredizas de ducha 5400 series séries 5400 serie 5400 usa.
Instructions to install sterling shower door.
Instructions for application and curing time.
If the sub floor is uneven or not level it is recommended.
This shower door is designed to be specifically paired with a sterling shower module.
Tack in place fig.
Make sure the bathtub apron brace is engaged.
Construct a separate frame wall at least 6 15 2 cm from the masonry wall.
If installing this unit with a shower door refer to the shower door manufacturer s instructions for any special framing considerations.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
Failure to follow the directions could result in product damage.
Pay special attention to the section titled very important instructions.
Place fabric pad if included to cover all feet of the bath.
Follow the installation instructions provided as details may vary but the following steps are typical.
Install the door with the pivot side away from the showerhead for best results.
Your new sterling door can be installed with the door opening to either the right or left.
Step by step installation instructions for sterling finesse sliding bath and shower doors.
Before starting the installation lay out and identify all of the parts.
If installing this unit to a masonry wall make provisions for plumbing connections.
Parts identification 5 7 89 2 3 4 bypass bath doors bypass shower doors required tools 1 6 model number 1177729 2 a measure distance a subtract 1 4 6 mm or the width of a number 2 pencil from a and cut the bottom track.
If apron brace is damaged support back side of apron with a wood board.
Do not install this shower door if you do not have a sterling shower module installed.
Install the outside panel by lifting it up inside the top track and.
Attach the seal strip to the bottom of the door and cut it to the required length.
Lift it up inside the top track and bring it back to vertical as you hang the rollers on.